Laundry Renovations · Campbellfield 3061

Laundry Renovations in Campbellfield

Laundry renovations across Campbellfield. Whether the brief is a compact European laundry inside a hallway cupboard or a full walk-through laundry linking the kitchen to the yard, we approach the room with the same waterproofing and joinery detail as a bathroom.

  • 1 week – 2 weeks
    Typical duration
  • From $7,425
    Price guide
  • 6-year
    Warranty
  • Fixed
    Written price
Scope

What's included in your Campbellfield laundry renovation.

Every line below is written into the fixed-price contract before demolition begins. There are no allowances, no "PC sums" and no vague inclusions.

  • Custom laundry joinery to the millimetre
  • Full-height stone or laminate benchtops
  • Concealed washer/dryer stacks
  • Integrated laundry troughs
  • Floor waterproofing to AS3740
  • Tap and drain relocation where required
  • Ventilation and dryer venting
Standards

Certified, insured, warranted.

  • Wet-area waterproofing certificate
  • Licensed plumbing to trough and appliances
  • Six-year workmanship warranty
Our process, quality control & standards

Six stages. Three inspections. One accountable team.

Every Vision Line renovation runs the same documented sequence. Nothing is signed off verbally — every stage is photographed, and every certificate is issued to you in writing.

1. Consult & measure

Free on-site inspection. We measure, photograph and diagnose the substrate, plumbing routes and fall issues before quoting.

Site notes and photos issued to you.

2. Design & fixed quote

Every tile, tap, vanity and screen specified by product code in a written scope with locked-in start and finish dates.

You approve the written scope in full.

3. Rough-in & waterproofing

Demolition, plumbing and electrical rough-in with certificates. Substrate correction, screed to 1:80 fall, two-coat AS3740-2021 membrane.

Photographic waterproofing sign-off before tiling.

4. Tiling & joinery

Wall and floor tiling, custom joinery, tapware, screen and mirror installation. One project manager on-site daily.

Mid-build walkthrough with you.

5. Final inspection

Silicone at internal corners, detailed clean, snag list, tap flow tests and final photos.

Snag list closed in writing.

6. Handover & warranty

Formal handover with warranty pack, care guide, waterproofing certificate and plumbing/electrical Certificates of Compliance.

Warranty pack issued on the day.
Quality control

Three mandatory inspections before you accept the job.

Pre-waterproofing inspection

  • Substrate flatness (±3mm over 2m)
  • Fall to waste (min 1:80)
  • Hob and step-down heights
  • Tap and mixer set-out verified

Pre-tiling inspection

  • Membrane cured minimum 72 hours
  • Adhesion pull test on membrane
  • Puddle-flange bond verified
  • Set-out lines chalked and photographed

Pre-handover inspection

  • Silicone at every internal corner
  • Screen alignment within 1mm plumb
  • Tap flow rates & mixer temperatures logged
  • Snag list closed with client signature
Workmanship standards

Certified, insured, warranted.

  • Registered Domestic Builder (VBA)
  • Licensed Victorian plumber & A-Grade electrician on staff
  • AS3740-2021 waterproofing certificate on every job
  • AS3958.1 tiling installation standard
  • $20M public liability insurance
  • Six-year workmanship warranty on labour
  • Full manufacturer warranty pass-through on all fixtures

Registration numbers, insurance certificates and waterproofing certificates are available on request before you sign a contract.

Timeline

How your Campbellfield laundry renovation runs.

  1. Day 1–2 · Site protection, demolition and rubbish removal.
  2. Day 3–5 · Plumbing and electrical rough-in with certificates issued.
  3. Day 6–8 · Substrate prep, screed to falls, AS3740 waterproofing.
  4. Day 9–15 · Tiling, joinery, tapware and shower screen fit-off.
  5. Final day · Silicone, detailed clean, snag list and handover.

Typical on-site duration for Campbellfield: 1 week – 2 weeks.

Built for Campbellfield

Local considerations we plan for.

  • Home styles: 1960s–70s brick veneers and post-war weatherboards dominate the streetscape — informs substrate choice and layout options.
  • Preferred finishes: local requests skew toward matt subway and stone-look floors.
  • Site logistics: Slab-on-ground construction is the norm in Campbellfield — predictable pricing.
Laundry Renovations in Campbellfield

Frequently asked.

Do you cover our part of Campbellfield?

Yes. We service all of Campbellfield (3061) and the surrounding suburbs — Broadmeadows, Dallas, Fawkner, Coolaroo. Free on-site measure across the entire area.

Which laundry renovations style suits Campbellfield homes best?

Given the local mix of 1960s–70s brick veneers and post-war weatherboards, we most often recommend matt subway, paired with same-footprint full renovation. Every recommendation is confirmed against your specific floor plan during the design session.

Can you convert a full laundry into a European laundry?

Yes. We reroute plumbing, install a full-height cabinet stack, and reclaim the freed room for a walk-in pantry, second WC or study nook.

Do you supply the appliances?

We can — but most clients prefer to select their own. We size the joinery to the exact model dimensions you choose.

Ready to book your Campbellfield laundry renovation?

Free on-site inspection, fixed-price quote in writing within seven days, and a written start date.