
Bathroom Design in Hadfield
Bathroom design consultations across Hadfield. Common briefs from local homeowners include same-footprint modernisation and shower over bath removed for full walk-in shower, which we work through with scaled 2D plans before any material selection.
- Included with quoteTypical duration
- IncludedPrice guide
- 6-yearWarranty
- FixedWritten price
What's included in your Hadfield bathroom design.
Every line below is written into the fixed-price contract before demolition begins. There are no allowances, no "PC sums" and no vague inclusions.
- In-home measure and site conditions report
- Scale 2D floor plan and elevations
- Tile setting-out drawing per wall
- Fixture and finish selections (tapware, vanity, mirror, tile, screen)
- Material sample board
- Written specification linked to the quote
Certified, insured, warranted.
- Australian Bathroom Council design principles
- AS3740 compliance considered from concept stage
- Designer briefs included in fixed-price contract
Bathroom Designs we've completed across Melbourne's north.

Warm Oak & Travertine
Honed travertine, oak veneer joinery and brushed brass tapware.

Luxury Stone Ensuite
Book-matched travertine, twin oak vanity and brushed brass fixtures.

Fluted Stone Heritage
Fluted travertine, matte black tapware and a back-lit curved mirror.
Six stages. Three inspections. One accountable team.
Every Vision Line renovation runs the same documented sequence. Nothing is signed off verbally — every stage is photographed, and every certificate is issued to you in writing.
1. Consult & measure
Free on-site inspection. We measure, photograph and diagnose the substrate, plumbing routes and fall issues before quoting.
2. Design & fixed quote
Every tile, tap, vanity and screen specified by product code in a written scope with locked-in start and finish dates.
3. Rough-in & waterproofing
Demolition, plumbing and electrical rough-in with certificates. Substrate correction, screed to 1:80 fall, two-coat AS3740-2021 membrane.
4. Tiling & joinery
Wall and floor tiling, custom joinery, tapware, screen and mirror installation. One project manager on-site daily.
5. Final inspection
Silicone at internal corners, detailed clean, snag list, tap flow tests and final photos.
6. Handover & warranty
Formal handover with warranty pack, care guide, waterproofing certificate and plumbing/electrical Certificates of Compliance.
Three mandatory inspections before you accept the job.
Pre-waterproofing inspection
- Substrate flatness (±3mm over 2m)
- Fall to waste (min 1:80)
- Hob and step-down heights
- Tap and mixer set-out verified
Pre-tiling inspection
- Membrane cured minimum 72 hours
- Adhesion pull test on membrane
- Puddle-flange bond verified
- Set-out lines chalked and photographed
Pre-handover inspection
- Silicone at every internal corner
- Screen alignment within 1mm plumb
- Tap flow rates & mixer temperatures logged
- Snag list closed with client signature
Certified, insured, warranted.
- Registered Domestic Builder (VBA)
- Licensed Victorian plumber & A-Grade electrician on staff
- AS3740-2021 waterproofing certificate on every job
- AS3958.1 tiling installation standard
- $20M public liability insurance
- Six-year workmanship warranty on labour
- Full manufacturer warranty pass-through on all fixtures
Registration numbers, insurance certificates and waterproofing certificates are available on request before you sign a contract.
How your Hadfield bathroom design runs.
- Day 1–2 · Site protection, demolition and rubbish removal.
- Day 3–5 · Plumbing and electrical rough-in with certificates issued.
- Day 6–8 · Substrate prep, screed to falls, AS3740 waterproofing.
- Day 9–15 · Tiling, joinery, tapware and shower screen fit-off.
- Final day · Silicone, detailed clean, snag list and handover.
Typical on-site duration for Hadfield: Included with quote.
Local considerations we plan for.
- Home styles: 1950s cream-brick homes and 1960s double-brick homes dominate the streetscape — informs substrate choice and layout options.
- Preferred finishes: local requests skew toward matt subway and 600×600 concrete-look.
- Site logistics: Hadfield's older sewer lines are cast-iron in some streets — where our plumber identifies a compromised riser during demolition we quote the replacement as a documented variation before continuing.
Everything under one contract.
Frequently asked.
Do you cover our part of Hadfield?
Yes. We service all of Hadfield (3046) and the surrounding suburbs — Glenroy, Fawkner, Pascoe Vale, Coburg. Free on-site measure across the entire area.
Which bathroom design style suits Hadfield homes best?
Given the local mix of 1950s cream-brick homes and 1960s double-brick homes, we most often recommend matt subway, paired with same-footprint modernisation. Every recommendation is confirmed against your specific floor plan during the design session.
Is the design charge separate from the build?
No. Design is included in every fixed-price contract we sign. Standalone design-only engagements are quoted per project.
Can we take your drawings to another builder?
The drawings are your property once the design fee is paid. In practice, our clients almost always keep the design and build under one contract because it eliminates blame-shifting.
Ready to book your Hadfield bathroom design?
Free on-site inspection, fixed-price quote in writing within seven days, and a written start date.