Ensuite Renovation design inspiration by Vision Line Bathrooms
Ensuite Renovations · Brunswick 3056

Ensuite Renovations in Brunswick

Ensuite renovations across Brunswick. Homes here are typically victorian workers' cottages, which means ensuites often sit on an external plumbing wall with tight door swings. Our ensuite work focuses on stretching every millimetre — recessed niches, wall-hung vanities and frameless glass — so the finished room feels roomier without moving structural walls.

  • 2 weeks, 3 days – 3 weeks
    Typical duration
  • From $17,850
    Price guide
  • 6-year
    Warranty
  • Fixed
    Written price
Scope

What's included in your Brunswick ensuite renovation.

Every line below is written into the fixed-price contract before demolition begins. There are no allowances, no "PC sums" and no vague inclusions.

  • Layout redesign optimised for small footprints
  • Recessed shower niches and floating vanities
  • Frameless glass shower screens
  • Twin vanity reconfiguration where space permits
  • Feature tile walls with matching stone
  • Concealed cistern toilets to save floor space
  • In-floor heating (optional add-on)
  • Full waterproofing certificate
Standards

Certified, insured, warranted.

  • AS3740-2021 waterproofing on all wet zones
  • Licensed plumbing + electrical
  • Frameless shower screen certified installers
  • Six-year workmanship warranty
Our process, quality control & standards

Six stages. Three inspections. One accountable team.

Every Vision Line renovation runs the same documented sequence. Nothing is signed off verbally — every stage is photographed, and every certificate is issued to you in writing.

1. Consult & measure

Free on-site inspection. We measure, photograph and diagnose the substrate, plumbing routes and fall issues before quoting.

Site notes and photos issued to you.

2. Design & fixed quote

Every tile, tap, vanity and screen specified by product code in a written scope with locked-in start and finish dates.

You approve the written scope in full.

3. Rough-in & waterproofing

Demolition, plumbing and electrical rough-in with certificates. Substrate correction, screed to 1:80 fall, two-coat AS3740-2021 membrane.

Photographic waterproofing sign-off before tiling.

4. Tiling & joinery

Wall and floor tiling, custom joinery, tapware, screen and mirror installation. One project manager on-site daily.

Mid-build walkthrough with you.

5. Final inspection

Silicone at internal corners, detailed clean, snag list, tap flow tests and final photos.

Snag list closed in writing.

6. Handover & warranty

Formal handover with warranty pack, care guide, waterproofing certificate and plumbing/electrical Certificates of Compliance.

Warranty pack issued on the day.
Quality control

Three mandatory inspections before you accept the job.

Pre-waterproofing inspection

  • Substrate flatness (±3mm over 2m)
  • Fall to waste (min 1:80)
  • Hob and step-down heights
  • Tap and mixer set-out verified

Pre-tiling inspection

  • Membrane cured minimum 72 hours
  • Adhesion pull test on membrane
  • Puddle-flange bond verified
  • Set-out lines chalked and photographed

Pre-handover inspection

  • Silicone at every internal corner
  • Screen alignment within 1mm plumb
  • Tap flow rates & mixer temperatures logged
  • Snag list closed with client signature
Workmanship standards

Certified, insured, warranted.

  • Registered Domestic Builder (VBA)
  • Licensed Victorian plumber & A-Grade electrician on staff
  • AS3740-2021 waterproofing certificate on every job
  • AS3958.1 tiling installation standard
  • $20M public liability insurance
  • Six-year workmanship warranty on labour
  • Full manufacturer warranty pass-through on all fixtures

Registration numbers, insurance certificates and waterproofing certificates are available on request before you sign a contract.

Timeline

How your Brunswick ensuite renovation runs.

  1. Day 1–2 · Site protection, demolition and rubbish removal.
  2. Day 3–5 · Plumbing and electrical rough-in with certificates issued.
  3. Day 6–8 · Substrate prep, screed to falls, AS3740 waterproofing.
  4. Day 9–15 · Tiling, joinery, tapware and shower screen fit-off.
  5. Final day · Silicone, detailed clean, snag list and handover.

Typical on-site duration for Brunswick: 2 weeks, 3 days – 3 weeks.

Built for Brunswick

Local considerations we plan for.

  • Home styles: victorian workers' cottages and edwardian terraces dominate the streetscape — informs substrate choice and layout options.
  • Preferred finishes: local requests skew toward handmade moroccan zellige and terrazzo slabs.
  • Site logistics: Access is the single hardest thing about Brunswick jobs — many terraces have no rear lane, no driveway, and street parking is metered. We plan material deliveries on off-peak days and use protective floor coverings from footpath to bathroom door.
Ensuite Renovations in Brunswick

Frequently asked.

Do you cover our part of Brunswick?

Yes. We service all of Brunswick (3056) and the surrounding suburbs — Coburg, Pascoe Vale. Free on-site measure across the entire area.

Which ensuite renovations style suits Brunswick homes best?

Given the local mix of victorian workers' cottages and edwardian terraces, we most often recommend handmade moroccan zellige, paired with bath removed for architectural walk-in shower. Every recommendation is confirmed against your specific floor plan during the design session.

Our ensuite is tiny — is it worth renovating?

Almost always yes. A well-designed 3m² ensuite with wall-hung joinery, a frameless screen and a large-format tile can feel bigger than a badly designed 6m² ensuite.

Can you install a twin vanity in a small ensuite?

Often yes — with a 1500–1800mm run, we can fit a twin basin vanity while keeping walking clearance. We confirm with a scale drawing before you sign.

Ready to book your Brunswick ensuite renovation?

Free on-site inspection, fixed-price quote in writing within seven days, and a written start date.