Craigieburn · 3064

Bathroom Renovations in Craigieburn

Craigieburn is one of Australia's fastest-growing residential corridors and one of our busiest bathroom-renovation postcodes. Most Craigieburn homes are volume-built family houses from the last twenty years — Highlands, Aston, Mount Ridley. Renovations here are almost always driven by failed builder-grade showers, dated tapware, and a design lift for owners who did not pick the finishes originally.

Design inspiration

Bathroom styles for Craigieburn homes.

Design directions and material palettes to inspire your renovation — not completed projects.

Browse all design styles →
Why Craigieburn

Why homeowners in Craigieburn choose Vision Line

Craigieburn owners come to us because they want the bathroom done properly the second time. Full membrane, correct falls, permanent porcelain, semi-frameless glass — and finishes selected from a proper showroom range rather than a builder's small default palette.

  • Fixed-price contract, no surprise variations
  • Licensed plumber and electrician on every job
  • Waterproofing certificate provided on completion
  • Workmanship warranty confirmed in writing
  • Fully insured — public liability cover in place
  • Photographic waterproofing sign-off before tiling
Local context

Renovating Craigieburn homes

In newer Craigieburn homes we consistently find pre-formed acrylic shower bases with tile stuck over the top — a permanent fix is a full base rebuild with proper membrane and screed. This is the single most common Craigieburn renovation we do.

Completed Vision Line bathroom renovation near Craigieburn
Common home styles
  • 2005–2020 volume-built family homes (Metricon, Simonds, Porter Davis)
  • Newer masterplanned estate housing
  • Townhouses
Popular layout changes
  • Full rebuild of failed shower
  • Ensuite modernised
  • Bath removed for full walk-in shower
Popular finishes
  • 600×1200 large-format porcelain
  • Warm concrete-look floors
  • Semi-frameless clear glass
Indicative budget
$18,000$34,000

Ranges below are indicative and depend on layout changes, tile selection and tapware. Your written quote is fixed before any demolition starts.

Timing
  • Most main bathrooms run about 3–4 weeks on site
  • Ensuites are typically a little shorter
  • Written quote after your on-site inspection
Get your Craigieburn quote
Our process

Four phases. Twelve stages. Same order, every job.

See the full 12-stage process →
  1. 01

    Planning

    Inspection, design, selections, fixed written quote

  2. 02

    Construction preparation

    Site protection, demolition, plumbing and electrical rough-in

  3. 03

    Waterproofing & finishes

    Substrate, screed, waterproofing, tiling, joinery and fit-off

  4. 04

    Handover

    Detail clean, compliance paperwork, walk-through with you

Materials & maintenance

Built for how Craigieburn homes actually live.

Every material we specify has to earn its place three ways: it has to look right in the home, hold up under Melbourne water conditions, and still be maintainable ten years from now — not just at handover.

  • Tiles

    P3/P4-rated porcelain on floors and shower zones (slip-safe when wet). Natural stone reserved for feature walls to avoid ongoing sealing.

  • Grout

    Waterproof epoxy grout in wet zones — no cracking, no mould regrowth and no re-grouting.

  • Tapware

    WELS-rated tapware. Brushed brass and gunmetal finishes are PVD-coated (not electroplated) to survive Melbourne water hardness.

  • Joinery

    Moisture-resistant board substrate on every vanity carcass — not standard MDF, which swells in a wet-area cabinet within four years.

Questions from Craigieburn

Frequently asked in Craigieburn.

Our Craigieburn ensuite already leaked once — can you actually fix it?

Yes. The reason repeat leaks happen is that repairs to visible silicone rarely last — the failure is behind the tile. We rebuild the shower entirely from the substrate up, with fresh two-coat membrane, correct falls, and reinforced internal corners.

Can you match the modern estate style?

Yes — warm stone-look tiles, matte black tapware, semi-frameless screens and stone-top vanities are our regular Craigieburn palette.

Do you provide fixed pricing?

Yes. Every quote we issue is fixed in writing before demolition begins, including tiles, tapware, waterproofing, plumbing, electrical and rubbish removal. There are no hourly surprises.

Are your trades licensed and insured?

All plumbing is completed by a licensed Victorian plumber who issues a Certificate of Compliance. All electrical work is completed by an A-Grade electrician who issues an Electrical Safety Certificate. We carry $20M public liability insurance.

How long does a bathroom renovation take?

A standard main bathroom takes three to four weeks on site once demolition starts. Ensuites usually run two and a half to three weeks. Timelines are written into the contract with a start and finish date.

Ready to renovate your Craigieburn bathroom?

Free on-site inspection, a fixed written quote, and a start date on the contract.