Bathroom Renovations in Craigieburn
Craigieburn is one of Australia's fastest-growing residential corridors and one of our busiest bathroom-renovation postcodes. Most Craigieburn homes are volume-built family houses from the last twenty years — Highlands, Aston, Mount Ridley. Renovations here are almost always driven by failed builder-grade showers, dated tapware, and a design lift for owners who did not pick the finishes originally.
Bathroom styles for Craigieburn homes.
Design directions and material palettes to inspire your renovation — not completed projects.
Why homeowners in Craigieburn choose Vision Line
Craigieburn owners come to us because they want the bathroom done properly the second time. Full membrane, correct falls, permanent porcelain, semi-frameless glass — and finishes selected from a proper showroom range rather than a builder's small default palette.
- Fixed-price contract, no surprise variations
- Licensed plumber and electrician on every job
- Waterproofing certificate provided on completion
- Workmanship warranty confirmed in writing
- Fully insured — public liability cover in place
- Photographic waterproofing sign-off before tiling
Renovating Craigieburn homes
In newer Craigieburn homes we consistently find pre-formed acrylic shower bases with tile stuck over the top — a permanent fix is a full base rebuild with proper membrane and screed. This is the single most common Craigieburn renovation we do.

- 2005–2020 volume-built family homes (Metricon, Simonds, Porter Davis)
- Newer masterplanned estate housing
- Townhouses
- Full rebuild of failed shower
- Ensuite modernised
- Bath removed for full walk-in shower
- 600×1200 large-format porcelain
- Warm concrete-look floors
- Semi-frameless clear glass
Ranges below are indicative and depend on layout changes, tile selection and tapware. Your written quote is fixed before any demolition starts.
- Most main bathrooms run about 3–4 weeks on site
- Ensuites are typically a little shorter
- Written quote after your on-site inspection
Four phases. Twelve stages. Same order, every job.
- 01
Planning
Inspection, design, selections, fixed written quote
- 02
Construction preparation
Site protection, demolition, plumbing and electrical rough-in
- 03
Waterproofing & finishes
Substrate, screed, waterproofing, tiling, joinery and fit-off
- 04
Handover
Detail clean, compliance paperwork, walk-through with you
Built for how Craigieburn homes actually live.
Every material we specify has to earn its place three ways: it has to look right in the home, hold up under Melbourne water conditions, and still be maintainable ten years from now — not just at handover.
- Tiles
P3/P4-rated porcelain on floors and shower zones (slip-safe when wet). Natural stone reserved for feature walls to avoid ongoing sealing.
- Grout
Waterproof epoxy grout in wet zones — no cracking, no mould regrowth and no re-grouting.
- Tapware
WELS-rated tapware. Brushed brass and gunmetal finishes are PVD-coated (not electroplated) to survive Melbourne water hardness.
- Joinery
Moisture-resistant board substrate on every vanity carcass — not standard MDF, which swells in a wet-area cabinet within four years.
Everything under one contract
Frequently asked in Craigieburn.
Our Craigieburn ensuite already leaked once — can you actually fix it?
Yes. The reason repeat leaks happen is that repairs to visible silicone rarely last — the failure is behind the tile. We rebuild the shower entirely from the substrate up, with fresh two-coat membrane, correct falls, and reinforced internal corners.
Can you match the modern estate style?
Yes — warm stone-look tiles, matte black tapware, semi-frameless screens and stone-top vanities are our regular Craigieburn palette.
Do you provide fixed pricing?
Yes. Every quote we issue is fixed in writing before demolition begins, including tiles, tapware, waterproofing, plumbing, electrical and rubbish removal. There are no hourly surprises.
Are your trades licensed and insured?
All plumbing is completed by a licensed Victorian plumber who issues a Certificate of Compliance. All electrical work is completed by an A-Grade electrician who issues an Electrical Safety Certificate. We carry $20M public liability insurance.
How long does a bathroom renovation take?
A standard main bathroom takes three to four weeks on site once demolition starts. Ensuites usually run two and a half to three weeks. Timelines are written into the contract with a start and finish date.
Reading that pays for itself.
- 7 min read
Bathroom Renovation Cost Melbourne 2026 (Real Prices, Trade by Trade)
How much it costs to redo a bathroom in Melbourne in 2026: $18,500–$45,000+ by tier, a trade-by-trade cost breakdown, and what a fair fixed-price quote must include.
- 5 min read
How Long Does a Bathroom Renovation Take? (Real Melbourne Timelines)
Day-by-day Melbourne bathroom renovation timeline, including waterproofing cure times and typical delays.
- 8 min read
AS 3740 Waterproofing Explained — Bathroom Standard in Plain English
AS 3740-2021 in plain English: exactly what must be waterproofed in a bathroom, membrane build-up, hob and threshold details, and how to check a waterproofing certificate is legitimate.
- 6 min read
How to Diagnose a Shower Leak Before You Strip a Tile
Moisture mapping, silicone tests and hob inspection — how to work out where a shower is actually leaking from.
Ready to renovate your Craigieburn bathroom?
Free on-site inspection, a fixed written quote, and a start date on the contract.