Craigieburn · 3064

Bathroom Renovations in Craigieburn

Craigieburn is one of Australia's fastest-growing residential corridors and one of our busiest bathroom-renovation postcodes. Most Craigieburn homes are volume-built family houses from the last twenty years — Highlands, Aston, Mount Ridley. Renovations here are almost always driven by failed builder-grade showers, dated tapware, and a design lift for owners who did not pick the finishes originally.

  • 3 weeks, 2 days
    Typical build
  • $22,500
    Typical spend
  • 6-year
    Workmanship warranty
  • AS3740
    Waterproofing certified
Why Craigieburn

Why homeowners in Craigieburn choose Vision Line

Craigieburn owners come to us because they want the bathroom done properly the second time. Full membrane, correct falls, permanent porcelain, semi-frameless glass — and finishes selected from a proper showroom range rather than a builder's small default palette.

  • Fixed-price contracts, no surprise variations
  • Licensed plumber + electrician on every job
  • AS3740-compliant waterproofing certificate
  • Six-year workmanship warranty
  • $20M public liability insurance
  • Photographic waterproofing sign-off
Local context

Built for Craigieburn homes.

In newer Craigieburn homes we consistently find pre-formed acrylic shower bases with tile stuck over the top — a permanent fix is a full base rebuild with proper membrane and screed. This is the single most common Craigieburn renovation we do.

Common home styles
  • 2005–2020 volume-built family homes (Metricon, Simonds, Porter Davis)
  • Newer masterplanned estate housing
  • Townhouses
Most requested layouts
  • Full rebuild of failed shower
  • Ensuite modernised
  • Bath removed for full walk-in shower
Popular tile & finish styles
  • 600×1200 large-format porcelain
  • Warm concrete-look floors
  • Semi-frameless clear glass
Typical renovation budget
Range: $18,000$34,000
Typical spend: $22,500
Build time: 3 weeks, 2 days
Our process

Twelve stages. Same order, every job.

Every Craigieburn bathroom runs the same twelve-stage build: site protection, demolition, plumbing and electrical rough-in, wall and floor preparation, screeding, waterproofing, tiling, vanity and cabinet fit-off, shower screen, detailed clean and final handover.

Other services in Craigieburn

Everything under one contract

Materials & maintenance

Built for how Craigieburn homes actually live.

Every material we specify for a Craigieburn bathroom has to earn its place three ways: it has to look right in the home, it has to hold up under Melbourne water conditions, and it has to be maintainable ten years from now — not just at handover.

  • Tiles

    P3/P4-rated porcelain on floors and shower zones (slip-safe when wet). Natural stone reserved for feature walls to avoid ongoing sealing.

  • Grout

    Waterproof epoxy grout in wet zones — no cracking, no mould regrowth, no re-grouting inside the warranty period.

  • Tapware

    WELS-rated tapware with 15-year manufacturer warranty. Brushed brass and gunmetal finishes are PVD-coated (not electroplated) to survive Melbourne water hardness.

  • Joinery

    Moisture-resistant board substrate on every vanity carcass — not standard MDF, which swells in a wet-area cabinet within four years.

Questions from Craigieburn

Frequently asked in Craigieburn.

Our Craigieburn ensuite already leaked once — can you actually fix it?

Yes. The reason repeat leaks happen is that repairs to visible silicone rarely last — the failure is behind the tile. We rebuild the shower entirely from the substrate up, with fresh two-coat membrane, correct falls, and reinforced internal corners.

Can you match the modern estate style?

Yes — warm stone-look tiles, matte black tapware, semi-frameless screens and stone-top vanities are our regular Craigieburn palette.

Do you provide fixed pricing?

Yes. Every quote we issue is fixed in writing before demolition begins, including tiles, tapware, waterproofing, plumbing, electrical and rubbish removal. There are no hourly surprises.

Are your trades licensed and insured?

All plumbing is completed by a licensed Victorian plumber who issues a Certificate of Compliance. All electrical work is completed by an A-Grade electrician who issues an Electrical Safety Certificate. We carry $20M public liability insurance.

How long does a bathroom renovation take?

A standard main bathroom takes three to four weeks on site once demolition starts. Ensuites usually run two and a half to three weeks. Timelines are written into the contract with a start and finish date.

Ready to renovate your Craigieburn bathroom?

Free on-site inspection, fixed-price quote in writing within seven days, and a start date on the contract.