Bathroom Renovations in Preston
Preston sits at the point where the inner-north's Californian bungalows and Edwardians give way to Reservoir's post-war stock. Most Preston bathroom renovations we quote are in homes that have already been extended or partially renovated — the kitchen is done, the living areas have been opened up, and the bathroom is now the last dated room. Layouts are usually tight and constrained by an external plumbing wall, which means a good renovation depends on a designer who can actually stretch every millimetre.
Bathroom styles for Preston homes.
Design directions and material palettes to inspire your renovation — not completed projects.
Why homeowners in Preston choose Vision Line
Preston clients tend to be design-literate — they have researched tapware brands, know the difference between honed and polished travertine, and want a builder who will not talk down to them. We treat every Preston quote as a design conversation first and a build quote second. Everything ends up in one fixed-price contract with materials specified line by line.
- Fixed-price contract, no surprise variations
- Licensed plumber and electrician on every job
- Waterproofing certificate provided on completion
- Workmanship warranty confirmed in writing
- Fully insured — public liability cover in place
- Photographic waterproofing sign-off before tiling
Renovating Preston homes
Older Preston homes commonly have galvanised or lead-lined supply plumbing that must be replaced in copper or PEX-B during rough-in — we quote this in advance rather than as a variation. Heritage overlays apply on some Preston streets; we check Darebin's HO maps before any external work.

- Edwardian and Californian bungalows
- Post-war weatherboards
- Art Deco flats near Preston Market
- New infill townhouses
- Bath removed for luxury walk-in shower
- Ensuite added to master
- Powder room under stairs
- Fluted stone feature walls
- Honed travertine
- Handmade zellige mosaics
Ranges below are indicative and depend on layout changes, tile selection and tapware. Your written quote is fixed before any demolition starts.
- Most main bathrooms run about 3–4 weeks on site
- Ensuites are typically a little shorter
- Written quote after your on-site inspection
Four phases. Twelve stages. Same order, every job.
- 01
Planning
Inspection, design, selections, fixed written quote
- 02
Construction preparation
Site protection, demolition, plumbing and electrical rough-in
- 03
Waterproofing & finishes
Substrate, screed, waterproofing, tiling, joinery and fit-off
- 04
Handover
Detail clean, compliance paperwork, walk-through with you
Built for how Preston homes actually live.
Every material we specify has to earn its place three ways: it has to look right in the home, hold up under Melbourne water conditions, and still be maintainable ten years from now — not just at handover.
- Tiles
P3/P4-rated porcelain on floors and shower zones (slip-safe when wet). Natural stone reserved for feature walls to avoid ongoing sealing.
- Grout
Waterproof epoxy grout in wet zones — no cracking, no mould regrowth and no re-grouting.
- Tapware
WELS-rated tapware. Brushed brass and gunmetal finishes are PVD-coated (not electroplated) to survive Melbourne water hardness.
- Joinery
Moisture-resistant board substrate on every vanity carcass — not standard MDF, which swells in a wet-area cabinet within four years.
Everything under one contract
Frequently asked in Preston.
Can you add an ensuite to our Preston Californian bungalow?
Yes. In bungalows the easiest ensuite is usually carved from a rear bedroom or laundry, drawing plumbing off the existing main-bathroom wall to minimise slab or floor cuts. Typical build is four weeks including cabinetry.
How do you handle the narrow bathrooms typical in Preston?
We use continuous floor drainage (linear grates), frameless shower screens, and floating vanities to keep sight-lines open. Removing the bath in favour of an oversized walk-in shower is by far our most-requested change in Preston.
Do you replace old galvanised pipes as part of the reno?
Where they are exposed by demolition, yes — replaced in copper or PEX-B and quoted upfront. Anything found beyond the bathroom is quoted as a documented variation before we touch it.
Do you provide fixed pricing?
Yes. Every quote we issue is fixed in writing before demolition begins, including tiles, tapware, waterproofing, plumbing, electrical and rubbish removal. There are no hourly surprises.
Are your trades licensed and insured?
All plumbing is completed by a licensed Victorian plumber who issues a Certificate of Compliance. All electrical work is completed by an A-Grade electrician who issues an Electrical Safety Certificate. We carry $20M public liability insurance.
How long does a bathroom renovation take?
A standard main bathroom takes three to four weeks on site once demolition starts. Ensuites usually run two and a half to three weeks. Timelines are written into the contract with a start and finish date.
Reading that pays for itself.
- 7 min read
Bathroom Renovation Cost Melbourne 2026 (Real Prices, Trade by Trade)
How much it costs to redo a bathroom in Melbourne in 2026: $18,500–$45,000+ by tier, a trade-by-trade cost breakdown, and what a fair fixed-price quote must include.
- 5 min read
How Long Does a Bathroom Renovation Take? (Real Melbourne Timelines)
Day-by-day Melbourne bathroom renovation timeline, including waterproofing cure times and typical delays.
- 8 min read
AS 3740 Waterproofing Explained — Bathroom Standard in Plain English
AS 3740-2021 in plain English: exactly what must be waterproofed in a bathroom, membrane build-up, hob and threshold details, and how to check a waterproofing certificate is legitimate.
- 6 min read
How to Diagnose a Shower Leak Before You Strip a Tile
Moisture mapping, silicone tests and hob inspection — how to work out where a shower is actually leaking from.
Ready to renovate your Preston bathroom?
Free on-site inspection, a fixed written quote, and a start date on the contract.
