Greensborough · 3088

Bathroom Renovations in Greensborough

Greensborough housing is mostly 1970s and 1980s family homes on generous, often sloping blocks. Bathrooms are typically a reasonable size but very dated — brown or beige tiles, timber vanities, timber-framed screens. Full renovations without layout change are the norm here.

  • 3 weeks, 1 day
    Typical build
  • $24,000
    Typical spend
  • 6-year
    Workmanship warranty
  • AS3740
    Waterproofing certified
Why Greensborough

Why homeowners in Greensborough choose Vision Line

Greensborough clients want a modern, hard-wearing bathroom that will serve the family for the next fifteen years. Our Complete Package delivers exactly that inside a predictable fixed price.

  • Fixed-price contracts, no surprise variations
  • Licensed plumber + electrician on every job
  • AS3740-compliant waterproofing certificate
  • Six-year workmanship warranty
  • $20M public liability insurance
  • Photographic waterproofing sign-off
Local context

Built for Greensborough homes.

Split-level Greensborough homes sometimes have step-downs into bathrooms that create waterproofing complications — we address these with correctly formed hobs and continuous membrane during rebuild.

Common home styles
  • 1970s brick veneers
  • 1980s split-level family homes
  • Newer townhouses
Most requested layouts
  • Same-footprint renovation
  • Ensuite modernised
  • Bath removed for walk-in shower
Popular tile & finish styles
  • 600×1200 large-format porcelain
  • Concrete-look floors
  • Timber-look feature strips
Typical renovation budget
Range: $18,500$36,000
Typical spend: $24,000
Build time: 3 weeks, 1 day
Our process

Twelve stages. Same order, every job.

Every Greensborough bathroom runs the same twelve-stage build: site protection, demolition, plumbing and electrical rough-in, wall and floor preparation, screeding, waterproofing, tiling, vanity and cabinet fit-off, shower screen, detailed clean and final handover.

Other services in Greensborough

Everything under one contract

Materials & maintenance

Built for how Greensborough homes actually live.

Every material we specify for a Greensborough bathroom has to earn its place three ways: it has to look right in the home, it has to hold up under Melbourne water conditions, and it has to be maintainable ten years from now — not just at handover.

  • Tiles

    P3/P4-rated porcelain on floors and shower zones (slip-safe when wet). Natural stone reserved for feature walls to avoid ongoing sealing.

  • Grout

    Waterproof epoxy grout in wet zones — no cracking, no mould regrowth, no re-grouting inside the warranty period.

  • Tapware

    WELS-rated tapware with 15-year manufacturer warranty. Brushed brass and gunmetal finishes are PVD-coated (not electroplated) to survive Melbourne water hardness.

  • Joinery

    Moisture-resistant board substrate on every vanity carcass — not standard MDF, which swells in a wet-area cabinet within four years.

Questions from Greensborough

Frequently asked in Greensborough.

Our bathroom is a step down from the hallway — is that a problem?

Not if it's dealt with properly. We form a compliant hob or drop-transition and continue the waterproofing membrane across it. Done right, there's no leak risk.

Do you provide fixed pricing?

Yes. Every quote we issue is fixed in writing before demolition begins, including tiles, tapware, waterproofing, plumbing, electrical and rubbish removal. There are no hourly surprises.

Are your trades licensed and insured?

All plumbing is completed by a licensed Victorian plumber who issues a Certificate of Compliance. All electrical work is completed by an A-Grade electrician who issues an Electrical Safety Certificate. We carry $20M public liability insurance.

How long does a bathroom renovation take?

A standard main bathroom takes three to four weeks on site once demolition starts. Ensuites usually run two and a half to three weeks. Timelines are written into the contract with a start and finish date.

Ready to renovate your Greensborough bathroom?

Free on-site inspection, fixed-price quote in writing within seven days, and a start date on the contract.