South Morang · 3752

Bathroom Renovations in South Morang

South Morang is largely 1990s and 2000s masterplanned housing — homes with reasonable-sized bathrooms and ensuites built to the standard of the day. Ten to twenty years on, most of these need re-waterproofing behind the shower and a full finish upgrade. Layout changes are less common here than in older suburbs.

  • 3 weeks
    Typical build
  • $23,500
    Typical spend
  • 6-year
    Workmanship warranty
  • AS3740
    Waterproofing certified
Why South Morang

Why homeowners in South Morang choose Vision Line

We work in South Morang on both main bathrooms and ensuites, often together. Our fixed-price contracts and photographic waterproofing sign-off give owners a clean paper trail if they ever sell.

  • Fixed-price contracts, no surprise variations
  • Licensed plumber + electrician on every job
  • AS3740-compliant waterproofing certificate
  • Six-year workmanship warranty
  • $20M public liability insurance
  • Photographic waterproofing sign-off
Local context

Built for South Morang homes.

Many South Morang homes have external plumbing walls running through the roof space — we allow for exhaust re-runs and hot-water flow adjustments in the initial quote.

Common home styles
  • 1990s–2000s brick family homes
  • Townhouses
  • Newer estate homes
Most requested layouts
  • Same-footprint renovation
  • Ensuite modernised with double vanity
  • Walk-in shower replaces corner shower
Popular tile & finish styles
  • Large-format stone-look
  • Kit-kat feature walls
  • Matt subway
Typical renovation budget
Range: $18,500$34,000
Typical spend: $23,500
Build time: 3 weeks
Our process

Twelve stages. Same order, every job.

Every South Morang bathroom runs the same twelve-stage build: site protection, demolition, plumbing and electrical rough-in, wall and floor preparation, screeding, waterproofing, tiling, vanity and cabinet fit-off, shower screen, detailed clean and final handover.

Other services in South Morang

Everything under one contract

Materials & maintenance

Built for how South Morang homes actually live.

Every material we specify for a South Morang bathroom has to earn its place three ways: it has to look right in the home, it has to hold up under Melbourne water conditions, and it has to be maintainable ten years from now — not just at handover.

  • Tiles

    P3/P4-rated porcelain on floors and shower zones (slip-safe when wet). Natural stone reserved for feature walls to avoid ongoing sealing.

  • Grout

    Waterproof epoxy grout in wet zones — no cracking, no mould regrowth, no re-grouting inside the warranty period.

  • Tapware

    WELS-rated tapware with 15-year manufacturer warranty. Brushed brass and gunmetal finishes are PVD-coated (not electroplated) to survive Melbourne water hardness.

  • Joinery

    Moisture-resistant board substrate on every vanity carcass — not standard MDF, which swells in a wet-area cabinet within four years.

Questions from South Morang

Frequently asked in South Morang.

Can we do main and ensuite in one visit?

Yes — we typically overlap the two by staging demolition and trades. Total site time is around five weeks with one bathroom always usable.

Do you provide fixed pricing?

Yes. Every quote we issue is fixed in writing before demolition begins, including tiles, tapware, waterproofing, plumbing, electrical and rubbish removal. There are no hourly surprises.

Are your trades licensed and insured?

All plumbing is completed by a licensed Victorian plumber who issues a Certificate of Compliance. All electrical work is completed by an A-Grade electrician who issues an Electrical Safety Certificate. We carry $20M public liability insurance.

How long does a bathroom renovation take?

A standard main bathroom takes three to four weeks on site once demolition starts. Ensuites usually run two and a half to three weeks. Timelines are written into the contract with a start and finish date.

Ready to renovate your South Morang bathroom?

Free on-site inspection, fixed-price quote in writing within seven days, and a start date on the contract.